Well, tomorrow marks 28 days that we've owned the property. My goal is still to be done in six weeks. With the approaching holiday, I may have a difficult time sticking to that goal, but it's still a possibility. The list of items left to do is getting smaller, but one item, the kitchen, is a large task. We've started gutting the kitchen and with the help of Roger, I was able to start hanging the upper cabinets. The big change you'll notice in these pictures are the new carpet. What a difference it makes!

New carpet in the second bedroom
New carpet in the master bedroom
Both sets of steps were carpeted. Here's the view going down into the lower level family room.
New carpet in the lower level family room
New light fixture, mirror, and towel bar in the main floor half bath. Hopefully, the new faucet will be installed by the next recap!
New faucet and vanity in the full bathroom
Toilet and shower doors reinstalled in the full bathroom
Kitchen demo begins. We're leaving the sink cabinet until we can get a plumber over to install a shut off valve under the sink. I was surprised there wasn't already one!
New cabinets going up. The lighting kind of makes them look a honey color, but they're a cinnamon maple. They already are making the space look brighter and cheerier.
New dining room chandelier